*This content was translated by AI.

DL E&C is showing confidence in its 'e-Pyung-han-se-sang Dongtan Station Urban One' project.
As various business changes related to the Seoul Metropolitan Area Express Railway (GTX) continue, expectations for improving the metropolitan area's extensive transportation network are growing. After a long delay, construction procedures for the GTX-C line have resumed, and as the GTX-A line gradually opens with expanded operating sections, interest in building an extensive transportation network connecting key areas of the Seoul Metropolitan Region is rising.
GTX is evaluated as a core transportation infrastructure that quickly connects outlying areas of the Seoul Metropolitan Region to major business districts in Seoul, reducing commute times and expanding living zones. It offers faster travel compared to existing express buses and subways, making it a key means to enhance proximity between home and workplace. Consequently, interest in residential value is growing around areas with excellent GTX accessibility.
Notably, the GTX-C line, which faced long delays due to construction cost issues, has concluded negotiations between the government and private developers and is expected to begin main construction as early as this year. If the C line opens without delay, travel time from Deokjeong Station to Samsung Station will be approximately 29 minutes, and from Suwon Station to Samsung Station about 27 minutes, significantly improving regional transportation convenience.
In addition, the GTX-A line is scheduled for full completion in 2028, with the third-phase project connecting the already opened southern section (Phase 1) from Suseo Station to Dongtan Station and the northern section (Phase 2) from Paju Unjeong to Seoul Station set to be finalized this year. Once the lines are fully connected, travel time between KINTEX and Dongtan Station by public transportation will be reduced from about two hours to under 40 minutes.
As the prospects for an improved metropolitan transportation network in the Seoul region become more concrete, DL E&C's 'e-Pyung-han-se-sang Dongtan Station Urban One,' a residential-style officetel located at Block C14 of Dongtan 2 New City, is emerging as a practical housing alternative. The complex will consist of three apartment buildings with 610 households (underground 4 floors to above-ground 46 floors) and one residential officetel building with 240 units (underground 3 floors to above-ground 26 floors).
The greatest advantage of 'e-Pyung-han-se-sang Dongtan Station Urban One' is its superior transportation environment. It is located in a station-adjacent area where both GTX and SRT Dongtan Stations are within walking distance. Using the GTX, it takes approximately 21 minutes to travel from Dongtan Station to Suseo Station.
A DL E&C representative who spoke with this newspaper by phone said, "As the Seoul Metropolitan Area Express Railway network gradually takes shape, we expect living convenience in the area around Dongtan Station, a key stop, to improve significantly."
A real estate expert who also spoke with this newspaper by phone stated, "The phased opening of GTX lines and the resumption of construction are key factors in resolving chronic traffic congestion in outlying areas of the Seoul Metropolitan Region. Especially around transfer stations where multiple railway lines and commercial infrastructure converge, expectations are bound to rise."
<© STARNEWS. All rights reserved. No reproduction or redistribution allowed.>
*This content was translated by AI.












![[Real Estate] Real Estate Goes Its Own Way?](https://image.starnewskorea.com/cdn-cgi/image/f=auto,w=271,h=188,fit=cover,g=face/21/2026/08/2026082313341961951_1.jpg)